See here the first version of the strategic development plan, approved by INTOSAI´s Governing Board in 2016.

 

During 2017, the PSC, CBC and KSC Chairs decided to promote a revision process, considering that the first SDP was produced with severe time constraints. The different INTOSAI bodies were consulted and following the procedures established at the “Due Process for the INTOSAI Framework of Professional Pronouncements”, the PSC Steering Committee, based on a technical analysis made by FIPP, approved a proposal for a revised SDP, that was endorsed by Governing Board at its 70th meeting in November 2017. 

 

Revised version of the SDP (with track changes or clean version

 

See in table below the status of each project in the current SDP:

 

Number of the Project in the SDP

Title of the Project

Category of pronouncement

Responsible Working Group[1]

Responsible

Goal Chair

Current stage of the Project

Related documents

1.1

Updating the preamble of

INTOSAI-P 10 to include a

reference to the UNs

resolutions 

INTOSAI -P

-

PSC

Project group analyzing comments on the exposure period to prepare endorsement version

Approved Project Proposal 

 

Approved Exposure Draft 

 

 

1.2

A more principles-based and

future-proof ISSAI 200

ISSAI

 

FAAS

PSC

Project group prepared  exposure draft, that was sent by PSC Chair to FIPP

Approved Project Proposal 

1.3

Consolidate and improve

INTOSAI practice notes to

ISSAIs

ISSAI

FAAS

PSC

Project group working on exposure draft 

Approved project proposal 

2.1

Acceptability of a public sector financial reporting framework

GUID

 

FAAS

PSC

Project group working on exposure draft 

 

Approved project proposal 

2.2

Guidance for examining and reporting on the regularity and propriety aspects in compliance audits (ref. old ISSAI 4100).

GUID

CAS

PSC

Project group working on exposure draft 

Approved Project Proposal

2.3

Guidance on carrying out combined audit in accordance with mandate of SAI

GUID

CAS ( project lead)

FAAS

PAS

PSC

Project proposal approved by FIPP

Scoping paper[2]

 

Approved Project Proposal

 

2.5

Consolidated

and improved

guidance on

understanding

internal

control in an

audit

GUID

ICS

PSC

Not initiated. Scope of the project under discussion

 

2.6

Consolidated

and improved

guidance on

reliance on the

work of

internal

auditors.

GUID

ICS

PSC

Project group working on final project proposal (after receiving recommendations from FIPP based on an initial project proposal)

Scoping Paper

 

 

2.7

Consolidating

and aligning

guidance for

audits of

Privatization

with ISSAI 100

 

 

GUID

Project group/s to be set up

KSC

Initial review completed[3] and two GUIDS are proposed – GUID on privatization, GUID on Public Private Partnership. Preliminary work to be done to identify scope and possible outcomes of project  

Initial Review

2.8

 Consolidating and aligning guidance on IT audit with ISSAI 100

 

GUID

WGITA

KSC

Project group working on exposure drafts

Approved Project Proposal - GUID 5300

 

Approved Project Proposal - GUID - 5310

 

2.9

GUID on the Audit of Public Debt

 

GUID

WGPD

KSC

Project group working on exposure draft

Approved Project Proposal

 

2.10

Consolidating

and aligning

the audit of

disaster

related aid

with ISSAI 100.

GUID

Project group to be set up

KSC

Initial review completed. Preliminary work to be done to identify scope and possible outcomes of project 

Initial Review 

2.11

Guidance for Public Procurement Audit

GUID

WGPPA

KSC

Project group working on exposure draft

Scoping paper 

 

Approved Project Proposal

 

2.12

International

Pronouncement

on

Jurisdictional

Activities of

SAIs

GUID

Forum of Jurisdictional SAIs (under WGVBS)

KSC

Project group working on final project proposal (after receiving recommendations from FIPP based on an initial project proposal)

 

3.10

Guidance on audit of the use and development of key national indicators (KNI)

GUID

WGKNI

KSC

Project group working on exposure draft

Approved Project Proposal

[1] working group here covers any INTOSAI working group´, subcommittee, task force or project group that carries out work in accordance with the Due Process.

[2] In the cases that the scope of the project was not sufficiently defined at the SDP, the PSC-SC asked the FIPP to produce a scoping paper to fill this gap (decision taken at the PSC-SC meeting in 2017)

[3] In the case of projects 2.7 and 2.10, an initial was needed for better definition of possible outcomes

 

 

The other projects included in priority 3 of the current SDP have not been initiated yet.